Syed Ihtisham Trading & Business SPC Phone+968 7903 0599 Emailinfo@sitboman.com

Home Services

House connections & utilities

Water and sewerage house connections, taken from excavation through to testing and full reinstatement.

What the work covers

Every item below is executed to the approved drawings and specification.

  • Water supply house connections
  • Sewerage and drainage connections
  • Trench excavation, shoring and bedding
  • Pipe laying, jointing and chamber works
  • Pressure testing and commissioning
  • Backfilling, compaction and surface reinstatement
Service trench cut through rock alongside the carriageway
Service trench cut through rock alongside the carriageway

Materials used

Everything is approved by submittal before it reaches site.

  • Water and wastewater pipe to the approved specification
  • Granular bedding and surround material
  • Detectable warning tape
  • Reinstatement materials matching the existing surface

Where it is used

The situations this package is normally called for.

  • House and building service connections
  • Water main and sewer branch connections
  • Chamber and valve box installation
  • Road crossings and full reinstatement

Registered activity and the scope of this work

The company’s commercial registration is issued for building and construction contracting (activity 410001). This package is undertaken within the scope of that registration, the licences in force, and the client’s own approval requirements. Where a package needs an activity or approval we do not currently hold, we say so before pricing rather than after award.

How this is built

A drawing of the method, not a photograph of a completed job.

House connections and utilities - trench sequence A trench shown in sequence: excavation with shoring, granular pipe bedding, the pipe laid to line and level, surround and warning tape, compacted backfill in layers, and full reinstatement of the road surface. Shored, never battered by eye Bedded on granular material Warning tape above the pipe Backfilled in layers, then surface fully reinstated 1 Excavate & shore 2 Bed & lay 3 Surround & tape 4 Backfill & reinstate Existing services are proved by hand before machine excavation begins.
Trench sequence from shored excavation through to full surface reinstatement.

How this work is run

Before mobilisation

A method statement and risk assessment written for this scope, material submittals approved, manpower and plant confirmed.

While the work runs

Daily supervision, stage inspection against the drawings, and site controls enforced whether or not the client’s representative attends.

At handover

Inspection and test records, as-built drawings, and the defects liability period honoured in writing.

Have works that need pricing?

Send us a scope, drawings, or tender documents and we will come back with a detailed quotation.