- 01 Riprap & slope protection Mortared, gabion and loose riprap for slope stabilisation, erosion control and drainage protection.
- 02 Road safety & guardrails Guardrail systems, terminals and road furniture installed to specification and set out on line and level.
- 03 Rigid pavements Concrete pavements and hardstandings where traffic loading, turning or standing plant would break a flexible surface.
- 04 Interlock & kerbstone works Interlock paving and kerbstone installation for walkways, parking areas, medians and pedestrian routes.
- 05 House connections & utilities Water and sewerage house connections, taken from excavation through to testing and full reinstatement.
01
Riprap & slope protection
Mortared, gabion and loose riprap for slope stabilisation, erosion control and drainage protection.
- Mortared riprap for slope protection and erosion control
- Gabion riprap and retaining structures
- Loose riprap and free-draining stone placement
- Slope stabilisation and embankment protection
- Drainage channel and watercourse protection
- Riprap maintenance and rehabilitation
02
Road safety & guardrails
Guardrail systems, terminals and road furniture installed to specification and set out on line and level.
- Guardrail installation and road safety barrier systems
- Post driving, terminals and end treatments
- Median works and road furniture
- Setting out, line and level verification
- Barrier repair and replacement works
03
Rigid pavements
Concrete pavements and hardstandings where traffic loading, turning or standing plant would break a flexible surface.
- Rigid concrete pavements to the approved thickness and grade
- Hardstandings, yards and equipment laydown areas
- Formwork, joint layout and dowel placement
- Sub-base preparation and compaction to specification
- Curing, joint sealing and surface finish
- Setting out, level control and stage inspection
04
Interlock & kerbstone works
Interlock paving and kerbstone installation for walkways, parking areas, medians and pedestrian routes.
- Interlock paving to walkways and pedestrian areas
- Parking areas and hard landscaped surfaces
- Kerbstone installation to roads and medians
- Sub-base preparation, bedding and compaction
- Edge restraint, jointing and finishing
- Reinstatement of paved surfaces after works
05
House connections & utilities
Water and sewerage house connections, taken from excavation through to testing and full reinstatement.
- Water supply house connections
- Sewerage and drainage connections
- Trench excavation, shoring and bedding
- Pipe laying, jointing and chamber works
- Pressure testing and commissioning
- Backfilling, compaction and surface reinstatement
Execution methodology
The four-stage execution pathway
This is the same methodology set out in our corporate profile, so a tender committee reads one process on the website and in the document, not two.
-
Stage 01
Planning
Feasibility assessment, site evaluation, technical planning, permitting, manpower planning and equipment requirements.
Objective Establish the right resources, people and sequence before anything moves.
-
Stage 02
Mobilisation
Workforce mobilisation, equipment setup, material coordination, site preparation and setting out.
Objective Put the required workforce, equipment, materials and technical resources on site.
-
Stage 03
Execution & monitoring
Daily inspections, workforce supervision, quality checks, progress tracking and HSE coordination.
Objective Keep safety, manpower, materials and progress aligned with the specification.
-
Stage 04
Handover
Final inspection, quality verification, defect rectification, completion documentation and formal sign-off.
Objective Deliver a complete, properly documented and professionally handed-over project.
Have works that need pricing?
Send us a scope, drawings, or tender documents and we will come back with a detailed quotation.
