Site engineering & supervision

Setting out, inspection and technical coordination, so the work is right before it is covered up.

What the work covers

Every item below is executed to the approved drawings and specification.

  • Field layout, surveying and levelling
  • Drawing interpretation and alignment verification
  • Material inspection and quality control
  • Structural site inspection and progress tracking
  • Subcontractor coordination and daily planning
  • Toolbox talks, HSE briefings and reporting
Setting out, inspection and technical coordination, so the work is right before it is covered up.
Setting out, inspection and technical coordination, so the work is right before it is covered up.

How this work is run

Before mobilisation

A method statement and risk assessment written for this scope, material submittals approved, manpower and plant confirmed.

While the work runs

Daily supervision, stage inspection against the drawings, and site controls enforced whether or not the client’s representative attends.

At handover

Inspection and test records, as-built drawings, and the defects liability period honoured in writing.